Services

Construction ,Engineering & Assembly

After 25 years, it is evident that ours is to execute engineering projects of the highest quality and following the highest national and international standards. From its inception, Banff S.A had a clear vision of what it wanted to do. Our style when doing things leads us to: "Combine knowledge to carry out any work"

Construction ,Engineering & Assembly

Sectors

Mining
Industry
Engineering
Manufacturing
Assembly
Construction
technology
Modern technology
Specialist in project development in collaborative BIM environments
seguro-de-vida
Security
In Banff 100% committed to the safety culture
carpeta
Quality materials
Quality is our best guarantee of customer loyalty
Hydraulic structure modeling
Flow Chart Modeling
Modeling of hydraulic works
Modeling of service networks
Proyectos Realizados

Mineria Sotrami S.A.

Category: Mining
Since January 2019 to December 2019

The project consisted in the elaboration of the basic engineering, procurement and construction of the disciplines of civil, mechanical and electromechanical works, of the water pumping system in the industrial area of ​​Minera Sotrami.

Description:

For the construction of the project, it was considered to establish an integral process made up of the following activities; civil works, earthworks; transfer, presentation and welding of HDPE (High Density Polystyrene) pipes, installation of four multi-stage electric pumps, installation of electrical panels, monitoring and control system, hydrostatic tests and finally the commissioning of the system guaranteeing the ideal functioning of this important system

Civil works, sizing of wells, reservoirs and pumps.

  • Installation of HDPE pipes. In the driving and impulsion line
  •  Supply and Assembly of Pumps, Pipes and mechanical accessories
  • Supply and assembly of pump control panels 
  • Assembly of Alvenius Pipe by Vitaulic-type quick coupling for pressures up to 750 Psi.
  • Setting the Anticipating Surge Valves and the Bomb Control Valve
  • Start-up and Start-up of the Pumping System of the 04 stations automatically up to the 1000 m3 Reservoir
  • Room of impulsion and discharge control valves of the 1000 M3 Reservoir
Our Clients

Información de Contacto

Somos especialistas en la gestión de proyectos de ingeniería y construcción a nivel internacional. Contamos con más de 30 años de experiencia.

Av. Circunvalación del Club Golf Los Incas Nº 202, oficina 1003. Urb. Santiago de Surco

+51 (511) 4378700

asalvatierra@banffperu.com
juanluna@banffperu.com

Banff Group © 2022. Todos los derechos reservados

en_USEN