Mineria Sotrami S.A.

Category: Mining
Since January 2019 to December 2019
The project consisted in the elaboration of the basic engineering, procurement and construction of the disciplines of civil, mechanical and electromechanical works, of the water pumping system in the industrial area of Minera Sotrami.
Description:
For the construction of the project, it was considered to establish an integral process made up of the following activities; civil works, earthworks; transfer, presentation and welding of HDPE (High Density Polystyrene) pipes, installation of four multi-stage electric pumps, installation of electrical panels, monitoring and control system, hydrostatic tests and finally the commissioning of the system guaranteeing the ideal functioning of this important system
Civil works, sizing of wells, reservoirs and pumps.
- Installation of HDPE pipes. In the driving and impulsion line
- Supply and Assembly of Pumps, Pipes and mechanical accessories
- Supply and assembly of pump control panels
- Assembly of Alvenius Pipe by Vitaulic-type quick coupling for pressures up to 750 Psi.
- Setting the Anticipating Surge Valves and the Bomb Control Valve
- Start-up and Start-up of the Pumping System of the 04 stations automatically up to the 1000 m3 Reservoir
- Room of impulsion and discharge control valves of the 1000 M3 Reservoir